Requirements for installation location of HSD magnetic inductive flowmeter

Time: 2024-09-13
Equipment Configuration:HSD magnetic inductive flowmeter

The selection of the installation location of the HSD magnetic inductive flowmeter is directly related to the stability of its working performance and the accuracy of the measurement results.

Project Overview

The selection of the installation location of the HSD magnetic inductive flowmeter is directly related to the stability of its working performance and the accuracy of the measurement results.

1. When choosing the installation location of HSD magnetic inductive flowmeter, you should pay attention to the following requirements

1. The installation location should try to avoid magnetic materials and equipment with strong electromagnetic fields.

2. Try to install it in a dry and ventilated place, not in a humid or water-prone location.

3. Avoid exposure to the sun and rain, ambient temperatures higher than 60°C and relative humidity greater than 95%.

4. The installation location is selected at the rear end of the water pump and must not be installed on the suction side; the valve should be installed on the downstream side of the flow rate.

2. Selection of pipe location for HSD electromagnetic flowmeter installation

1. The sensor can be installed on vertical pipes, horizontal pipes or inclined pipes, but the center line of the two electrodes is required to be at horizontal state.

2. When the electromagnetic flowmeter is working, the measuring tube is always required to be filled with the measured medium. When installing horizontally, in order to ensure this, if necessary, the elevation of the sensor installation location can be slightly lower than the elevation of the pipe, or there should be sufficient back pressure downstream of the sensor.

3. For liquid-solid two-phase media, it is best to install it vertically to make the sensor lining wear evenly and extend its service life.

In addition, the HSD magnetic inductive flowmeter should be installed in an installation location that is convenient for observation and maintenance so that staff can monitor and maintain the meter. In addition to HSD magnetic inductive flowmeters, vortex flowmeters, ultrasonic flowmeters, balance flowmeters, etc. should be installed in strict accordance with specifications to ensure the optimization and control of the industrial production process. To learn more about flow meter selection, installation, after-sales, maintenance and other related issues, you can contact the flow meter manufacturer - Supmea Measurement and Control at any time!

Related Cases

The magnetic inductive flowmeter industry, these are successful cases with comparable and reference value.

Please Fill In Your Request And We Will Contact You As Soon As Possible!

Whatsapp
Inquiry
Top